Pre-commissioning Activity Combined Cycle Power Plant (720MW)

tgu-combined-cycle-plant1

Project Type: Performance Testing/Tuning
Plant: Combined Cycle Power Plant (720MW) – Trinidad Generation Unlimited
Client: Ferrostaal – (EBE) Eisenbau Essen GMBH (Engineering, Procurement, Construction – EPC)

Pre-commissioning activity included emissions testing to determine manufacturer (Genera Electric – GE) guarantee specifications for six gas turbines and two steam turbines.  With the project nearing completion, Equilibrium Environmental Services (EES) stepped in to provide manpower and equipment to facilitate several 24hour test programs.  EES was able to validate emissions characteristics for gaseous and particulate emissions.  The source emissions program had technical oversight by GE performance engineers who were more than satisfied with the technical capability of the EES team.